Formula
Rate of a worker = 1 ÷ (days alone)Together: days = 1 ÷ (1/a + 1/b + 1/c)Other worker: 1/b = 1/t − 1/a
- One whole job = 1
Add the work each person does in one day, then divide 1 by that sum.
Worked example
A in 10 days, B in 15 days
- What do you want to find?
- Days to finish together (2–3 workers)
- Worker A alone (days)
- 10 days
- Worker B alone (days)
- 15 days
Days to finish together
6 days
Combined work per day: 16.6667%
How it works
If A can finish a job in 10 days and B in 15, A does 1/10 of it per day and B does 1/15. Together they do 1/10 + 1/15 = 1/6 per day, so the whole job takes 6 days. Each worker's share of the finished job is in proportion to their daily rate.
The same rate method works for pipes filling a tank (a draining pipe has a negative rate) and for any shared task. If A starts alone and B joins later, the tool works out how much is left when B arrives and divides by the combined rate. For proportion-style problems with men and days use Proportion Calculator (inverse mode).
Assumptions and limits
- Every worker is assumed to work at a constant rate and not get in each other's way.